New transshipment terminal in Brzeg Dolny
2010-08-19
The company
PCC Intermodal is planning to build a transshipment container terminal in Brzeg Dolny. The company has just announced a tender to choose a contractor to prepare the design documentation for the project.
The contractor will be responsible for preparing the technical-functional specifications as well as the construction design, and will also prepare all the necessary materials needed before applying for a construction permit. In addition, the contractor will also have to produce detailed designs for particular branches and structures, together with a transport system and instructions for operating the terminal. According to the investor's own timetable, the documentation should be ready and the construction permit obtained by 31 January 2011.
Find more news and analyses in internet service
Construction Poland Online and pdf newsletter
Polish Construction Review.